Start Safe Before Operations Begin
Commissioning is where design assumptions meet real operations. B² reviews the EHS systems needed for people, chemicals, equipment and workflows to function safely at startup.
Design & Pre-Occupancy Review
- Chemical use and storage assumptions
- Ventilation and exhaust needs
- Emergency equipment and access
- Waste accumulation and movement
- Equipment layout and maintainability
- Material receiving and transfer routes
- Training, SOP and inspection readiness
Pre-Startup Readiness
B² can support walkthroughs, punch lists, risk registers and readiness reviews before operations begin or after major process changes.
Operational Handoff
A facility is not truly commissioned when the equipment turns on. Procedures, ownership, inspections, emergency expectations and training need to transfer into routine operations.